|
|
We will be performing maintenance on s90 on the 22nd of February 2007, at 2AM CST. The backup drive will be upgraded to a larger capacity drive to ensure that the growing size of backups can be accomodated. Downtime should be no longer than 30 minutes.
Please accept our apologies for any inconvenience caused.
Kind Regards,
Aaron Weller |
|
|
|